One train, one round trip

SIMTA BTS · Sree Sandhya layout, drawing SJ BTS F-1032
SS ES call · clear
Full storage Empty storage Common track Working track, dead end Full bobbin Empty bobbin One dot = 10 bobbins

0bobbins delivered to R13
call to arrival
creel service time
Event log · what the PLC would timestamp
0.0 s / 20 s

Schematic, not to scale. One storage track of each kind is drawn; the real layout has two of each, and three ring frames with two working tracks each. Frame names follow the I/O list. The mill later renamed R13 to 14 on the drawing. 20 seconds here stands for about 25 minutes, and the creel phase in real life is hours.